polytropos

polytropos club

Posted: 18 Nov 2019


Taken: 15 Nov 2019

16 favorites     31 comments    493 visits

1/50 f/1.7 4.2 mm ISO 100

samsung SM-G950F


Location

Lat, Lng:  
You can copy the above to your favourite mapping app.
Address:  unknown

 View on map

See also...

i-Central i-Central


architecture (2) architecture (2)


See more...

Keywords

Bern
Switzerland
Casino Bern
Architektur
architecture
central
Zentralperspektive
Renovierung
reconstruction
Handy Shot
1740


Authorizations, license

Visible by: Everyone
All rights reserved

493 visits


Neues von der Baustelle.

Neues von der Baustelle.
Casino Bern – jetzt in Betrieb. (Eröffnungskonzert)

Stand 21.08.2019 (siehe auch PiP 1)

Berner Symphonieorchester
► PiP 2: Grundriss Erdgeschoss
► PiP 3: Längsschnitt


(46.94688, 07.44852); [90°] – swisstopo
Translate into English

Nouchetdu38, Pano ☼ Rapi ♫✯♫, AD AD, Liliane LR and 12 other people have particularly liked this photo


Latest comments - All (31)
 polytropos
polytropos club has replied
Sami, this is the exhaust or outgoing air from the concert hall. The supply air is in the walls and under the seats (not visible on the cross section).
5 years ago.
 Sami Serola (inactive)
Sami Serola (inactiv… club has replied
Ah, okay. That makes sense. I first thought it has something to do with acoustics! =D
5 years ago.
 polytropos
polytropos club has replied
Well, if it is too loud you'll have also a problem with the acoustics! ;-))
5 years ago.
 Sami Serola (inactive)
Sami Serola (inactiv… club has replied
Or call it as "wind instruments". =D
5 years ago.
 polytropos
polytropos club has replied
Sami, :-D
5 years ago.

Sign-in to write a comment.