GrahamH's photos

TILRGunnedahRd042022P4133909

13 Apr 2022 1 198
Gunnedah Rd, signs and control facing the country side. Similar ones faced the Tamworth side. April 2022.

TILRGunnedahRd042022P4133908

13 Apr 2022 1 210
Gunnedah Rd, the boom gate mechanism appeared to be identical at all three level crossings. April 2022.

TILRGunnedahRd042022P4133907

TILRGunnedahRd042022P4133925

13 Apr 2022 188
Gunndah Rd, general view of the level crossing from the country direction, it is similar to the other two LCs. April 2022.

TILRlandforindustryP4133886

13 Apr 2022 111
This road construction was happening a few hundred metres from the second stop block end of the line. We are looking at a cul de sac suitable for semitrailers. April 2022.

TIRLsecondStop042022P4133895

13 Apr 2022 2 195
The second stop block and beyond it the land being developed for industry which will be served by the rebuilt line. April 2022.

TIRLsecondStop042022P4133900

13 Apr 2022 194
The extent of the current works. Observe the tamped and not well tamped line running up to the second stop block. April 2022.

TIRLcurve from old042022P4133892

13 Apr 2022 182
This curve away from the original route of the Barraba line can be seen on Google satellite view. April 2022.

TIRLtoTamworth042022P4133893

13 Apr 2022 192
This photo shows how many of the previous photos are spatially related plus the new line deviating from the original route. April 2022.

TIRLfirstStopKm042022P4133885

13 Apr 2022 178
Just beyond the Murroon Creek culvert is the first of two stop blocks and a catchpoint to protect the line towards Tamworth from activity beyond the current works. These are just past the 457Km post. April 2022.

TIRLfirst StopCatchpoint042022P4133881

13 Apr 2022 186
Just beyond the Murroon Creek culvert is the first of two stop blocks and a catchpoint to protect the line towards Tamworth from activity beyond the current works. These are just past the 457Km post. April 2022.

TIRLfirst StopCatchpoint042022P4133879

TIRLfirst Stop042022P4133878

13 Apr 2022 183
Just beyond the Murroon Creek culvert is the first of two stop blocks and a catchpoint to protect the line towards Tamworth from activity beyond the current works. These are just past the 457Km post. April 2022.

TIRLculvert456.950Km042022P4133876

13 Apr 2022 166
Looking North West from near the culvert. A little further on is end of the current works. April 2022.

TIRLculvert456.950Km042022P4133872

13 Apr 2022 167
A culvert on the Tamworth Intermodal Rail Line over Murroon Creek at 456.950Km. Mouse over to see more views. See 'view on map' for location. April 2022

TIRLsign042022P4133871

13 Apr 2022 199
Location sign for train orders West of Evans St level crossing. April 2022.

TIRLsign042022P4133870

13 Apr 2022 186
Shunt limit sign West of Evans St level crossing. April 2022.

TILREvansSt0422P4133868

13 Apr 2022 185
Evans St, steel sleepers and rails. Mouse over for a closer look. April 2022.

9687 items in total