GrahamH's photos
TILRGunnedahRd042022P4133909
|
|
|
Gunnedah Rd, signs and control facing the country side. Similar ones faced the Tamworth side. April 2022.
TILRGunnedahRd042022P4133908
|
|
|
Gunnedah Rd, the boom gate mechanism appeared to be identical at all three level crossings. April 2022.
TILRGunnedahRd042022P4133907
|
|
|
TILRGunnedahRd042022P4133925
|
|
Gunndah Rd, general view of the level crossing from the country direction, it is similar to the other two LCs. April 2022.
TILRlandforindustryP4133886
|
|
This road construction was happening a few hundred metres from the second stop block end of the line. We are looking at a cul de sac suitable for semitrailers. April 2022.
TIRLsecondStop042022P4133895
|
|
|
The second stop block and beyond it the land being developed for industry which will be served by the rebuilt line. April 2022.
TIRLsecondStop042022P4133900
|
|
The extent of the current works. Observe the tamped and not well tamped line running up to the second stop block. April 2022.
TIRLcurve from old042022P4133892
|
|
This curve away from the original route of the Barraba line can be seen on Google satellite view. April 2022.
TIRLtoTamworth042022P4133893
|
|
This photo shows how many of the previous photos are spatially related plus the new line deviating from the original route. April 2022.
TIRLfirstStopKm042022P4133885
|
|
Just beyond the Murroon Creek culvert is the first of two stop blocks and a catchpoint to protect the line towards Tamworth from activity beyond the current works. These are just past the 457Km post. April 2022.
TIRLfirst StopCatchpoint042022P4133881
|
|
Just beyond the Murroon Creek culvert is the first of two stop blocks and a catchpoint to protect the line towards Tamworth from activity beyond the current works. These are just past the 457Km post. April 2022.
TIRLfirst StopCatchpoint042022P4133879
|
|
TIRLfirst Stop042022P4133878
|
|
Just beyond the Murroon Creek culvert is the first of two stop blocks and a catchpoint to protect the line towards Tamworth from activity beyond the current works. These are just past the 457Km post. April 2022.
TIRLculvert456.950Km042022P4133876
|
|
Looking North West from near the culvert. A little further on is end of the current works. April 2022.
TIRLculvert456.950Km042022P4133872
|
|
A culvert on the Tamworth Intermodal Rail Line over Murroon Creek at 456.950Km. Mouse over to see more views. See 'view on map' for location. April 2022