NRMv - NER No.1
NRMv - steel snowplough
NRMv - Matisa tamper
NRMv - people power
NRMv - early container ?
NRMv - war flat
NRMv - LSWR special
NRMv - shunter
NRM - Class 31
NRMv - Bye-Bye
MoW - WW1 / poppy project
MoW - ticket press
MoW - lamp
MoW - MIC documents
MoW - domestic life
MoW - soap
MoW - furniture
MoW - long case clock
MoW - tea ...
MoW - outside ...
MoW - wall plaque
MoW - artwork in glass
MoW - Town Hall
NRMv - coal waggons
NRMv - Hetton Lyon
NRMv - the new shed [HBM]
NRMv - wildflowers
NRMv - gaunless bridge {2 of 2}
NRMv - Gaunless Bridge {1 of 2}
NRMv - 60103
NRMv - horse to maglev
NRMv - Black Five & E5001
NRMv - just a couple of centuries developments
NRMv - Coat of arms
NRMv - HST vs LEV1
HoS - shunter
HoS - D6898 [HTT][HFF]
HoS - Maker's Plate [6947]
HoS - models
HoS - P2 viewing gallery [HBM]
HoS - new build ; LNER P2 2007 "Prince of Wales"
HoS - blocks
HoS - poster
HoS - 1925 plaque
HoS - "The Gent's Facilities" [interior HWW]
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
25 visits
NRMv - Tank 512 [1899]
![NRMv - Tank 512 [1899] NRMv - Tank 512 [1899]](https://cdn.ipernity.com/200/21/66/52662166.3c4ddb67.640.jpg?r2)

Tank wagon No.512. saddle mounted oil tank of 2047 UK gallons capacity, on a 4-wheel all wood chassis.
Built by Darlington Wagon & Engineering Company for the North Central Wagon Company and registered with the North Eastern Railway in 1889. Carried Shell-Mex & BP logos [up to 2023/4].
Built by Darlington Wagon & Engineering Company for the North Central Wagon Company and registered with the North Eastern Railway in 1889. Carried Shell-Mex & BP logos [up to 2023/4].
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
The timber chassis is still fully original.
I had written a comprehensive report / specification to do this work, but my tender was, apparently, not cheap enough.
Sign-in to write a comment.