Limekiln remains
Going down looking up
Track gang on the move
Summit Tunnel
Bentley Canal dereliction
Buckley Wells lineup
Norbury Hollow Crossing
Edenderry Power Station
Lower Laithe limekiln
Penmon Park Quarry incline
Steam on the main line
Northbound Freight
Carrying contract
Unloading at Shipley
Preparing to unload
Tram 1002
Clarghyll
Harbin Roundhouse
No.8 (Woodhead) Pit enginehouse New Haden Colliery
Duke of Gloucester at Bradnop
Ipstones
Superpower
Above Winkhill
Opencast memories
Beswick, Knutsford
Starting up the bank
Lledwigan Kiln
Llanfawr limekiln
Bradnop Bank 2
On Bradnop Bank
Dinosaur
Faces at the window
Almost a Foxfield sunrise
South Ferriby Cement Works
NCB South Leics
Mow Cop
The Congleton Railway
Banking out of the yard
The High Peak at Peak Forest
Foxfield Colliery departure
Sunset in the pit
Light repairs
Lock 13
Building the power station
West Offaly Power Station
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
197 visits
Steam test


SY1556 undergoing a steam test at the Sujiatun repair workshops. There were no cylinder ends on the locomotive and this was the result when the regulator was opened.
Typo93 has particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.