Carrying contract
Unloading at Shipley
Preparing to unload
Tram 1002
Clarghyll
Harbin Roundhouse
No.8 (Woodhead) Pit enginehouse New Haden Colliery
Duke of Gloucester at Bradnop
Ipstones
Superpower
Above Winkhill
Working in the dark
Near Blackbrook Crossing
Lledwigan Kiln
Winkhill
Crossed wires
Chatterley Whitfield
Tub on the line
Blackbrook Crossing
Approaching Apesford Crossing
Climbing past Winkhill
Crossing Ipstones summit
Cliff Farm crossing
Steam on the main line
Penmon Park Quarry incline
Lower Laithe limekiln
Edenderry Power Station
Norbury Hollow Crossing
Buckley Wells lineup
Bentley Canal dereliction
Summit Tunnel
Track gang on the move
Going down looking up
Limekiln remains
Steam test
Opencast memories
Beswick, Knutsford
Starting up the bank
Lledwigan Kiln
Llanfawr limekiln
Bradnop Bank 2
On Bradnop Bank
Dinosaur
Faces at the window
Almost a Foxfield sunrise
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
203 visits
Northbound Freight


A QJ starts a northbound freight away from the extensive yards at Suihua, north of Harbin. The jibs of the coaling cranes in the depot peep over the train and the water tower is to the left along with the smoke of the many locomotives to be found there. This was a very busy junction in 1992 with almost all services steam hauled and locomotives changed here.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.