The Future's Orange - 30 December 2014

The Future's Orange - 30 December 2014
There was Hi-vis as far as the eye could see as intensive work took place on the approaches to platforms 8-15 of London Bridge during a blockade which was scheduled from 20 December 2014 - 4 January 2015. The Thameslink Programme is changing London Bridge for ever and is so large that disruptions to services will continue until 2018.