StoneRoad2013's photos with the keyword: planks

TRv6 - painted planks {sides}

28 Apr 2023 1 85
Various planks being painted {3 of 3}. The red is the outside face for the body planks, the cream is the inside face of the roof planks [most of which are original] and the black is the underside of the floor. [normally the underside of floor planks are not painted, but modern plantation timber needs the additional protection] In the background, the van's body structural framework is now in undercoat.

TRv6 - painted planks {floor}

28 Apr 2023 94
Various planks being painted {2 of 3} The red is the outside face for the body planks, the cream is the inside face of the roof planks [most of which are original] and the black is the underside of the floor. [normally the underside of floor planks are not painted, but modern plantation timber needs the additional protection] In the background, the van's body structural framework is now in undercoat.

TRv6 - painted planks {roof}

28 Apr 2023 87
Various planks being painted {1 of 3} The red is the outside face for the body planks, the cream is the inside face of the roof planks [most of which are original] and the black is the underside of the floor. [normally the underside of floor planks are not painted, but modern plantation timber needs the additional protection] In the background, the van's body structural framework is now in undercoat.

TRv6 - plank blanks

08 Apr 2023 86
Softwood planks for both the van floor and the sides. Further machining will be done in-house, to achieve the exact profiles required.

NSR23 - interior planks & external panels

30 Dec 2020 141
Dry fitting the softwood planks that make up the interior at the outer end of the passenger section. Once removed these will be filled, knotted and primed, with the final finish will be medium oak scumble, protected by non-yellowing varnish. Progress is being made on fitting the exterior panelling (primed and grain-filled).

NSR23 - scumbled bulkhead

27 Dec 2018 1 1 744
Bulkhead planks after being scumbled as "figured light/medium oak". Once this has cured, it will be varnished for protection as the scumble finish is quite soft compared to standard coach paints.

BR971 - planks painted

28 Feb 2018 322
Painting underway on the bodywork planks, currently in light grey undercoat. Note the curved ends to the long planks, these fit into the corner plates (the black upright object is one of the corner plates, with the top plank adjusted to fit). The short end planks are not yet cut to their exact length, once they have been, the end grain will be painted.

RERM - bs - interior planks

28 Feb 2018 1 262
Almost all the woodwork is finished now, just the roof to dry fit. Cutting the air vents was an interesting exercise.

NER 7cmpt - new roof

12 May 2016 1 1 535
Stack of replacement roof planks await fitting. Normally, we dry fit planks and then remove them in order to paint the ceiling face. However, these will be covered by another layer, so will only be treated with knotting and preservative before installation.

NER 7cmpt - floor done

22 Sep 2015 661
The replaced floor planks are lighter in colour than the originals.