O&S - dominoes game
CAS - handling kit
O&S - pretty
oad - lola 'n' bibi
oad - march 16 lamb
oaw - red shank solo
oaw - sea snail
RER - Les
RER - seat end
RER - box boss
TiG (air) - apache
TiG - Proteus
TiG - RER - Northern Rock to go
TiG - RER - River Mite
whn - lowtide 17 Jan 2016
whn - scan harbour map
aav / wst / gbw - flooding at the arches
NER 7cmpt - valve before
NER 7cmpt - valve / flap
BT - Beamish 2016
gbw - falls
NER 7cmpt - door marks
rmf - coal sample
NER 7cmpt - first door done
MFL - evening rest
hedgepigs - the end
gbw - Weigela "Bristol Ruby"
aav / gbw - killfrost 2013
O&S - double daff
gbw - dad's daffs
BR gen - pair
BM gen - coffee pot no1 & box
fork candles !!
oaw[HH] - suppertime
whn - busy night
whn - wide open view
whn - night tide
whn - Emma's bows
whn - Emma
whn - DS7
whn - 9 steps visible
whn - 4 steps
oad - sign x2
NER 7cmpt - warning sign
NER 7cmpt - three
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
530 visits
NER 7cmpt - new roof


Stack of replacement roof planks await fitting.
Normally, we dry fit planks and then remove them in order to paint the ceiling face. However, these will be covered by another layer, so will only be treated with knotting and preservative before installation.
Normally, we dry fit planks and then remove them in order to paint the ceiling face. However, these will be covered by another layer, so will only be treated with knotting and preservative before installation.
Don Sutherland has particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.