See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
992 visits
PQR - Titan crane south breakwater


The Titan block-setting crane on the South Breakwater at Peterhead sometime after 1891. Shortly after this stage was reached it was discovered that the shelters didn't work in severe storms and the breakwater design was modified. This entailed the crane builder, Stothert & Pitt of Bath, rebuilding the crane to run on legs of equal height.
This image has the crane build date as 1891 and 50tons at 100ft radius as the load limit.
This image has the crane build date as 1891 and 50tons at 100ft radius as the load limit.
Der SIGGY, Maria, SV1XV, Peter_Private_Box and 7 other people have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Best Wishes, and a Good Weekend
Peter
Sign-in to write a comment.