MF - forward bulkhead
MF - skin fixing
TiG - fisheries patrol
BDD - surfing
BDD - stick n surf
BDD - fetch
SSW - trademark
SSW - apron arriving
1001 - machinery (RH Compressor)
DC - James Spooner model
DC - JS model ; cab detail
DC - JS model ; power bogie detail
BBH - Orpheus
BBH - Jetstar bows
BBH - Jetstar cockpit
BBH - Jetstar stern
BBH - DC's final resting place
BM FC - replaced headstock
BM FC - replaced cill and bufferbeam
SCL - upper tank
gbw - Easter 2012 snow
MF - relieving tube seacocks
TiG - Longstone Island
BJ - hinge site
MF - engineroom deck
MF - engine progress
MF - engine as found 1
MF - bilge under engine
DC - X marks the glass - panels primed
DC - taking shape
DC - almost finished
gbw - red flowers
1001 - stonework
oad - longhorns
gbw - catkins in spring
gdn / gbw - 2012 bud 2
gbw - 2012 bud 1
BDD - big stick
gbw - Yellow Cloud of west side daffs
gbw - east side daffs
gbw - spring flowers
BM - eve - gateway
bri - Arch with ivy
MF - restored pump
MF - rigging
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
466 visits
MF - forecabin sanding


The forward bulkhead between the chain locker and the forecabin is being sanded back to bare wood before re-varnishing. For information - the piece of timber visible on the far side of the chain locker (between the not quite vertical lines) is the rear of the stem post 22" at the top of the hatch.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.