MF - light fittings
GT - 105 glue test
GT - 104 glue test
GT - 103 glue test
MF - old galley
MF - Starboard side main cabin
MF - portholes
MF - cabin looking forward (before)
PA - armrest production
LBA - armchairs installed
LBA - more chairs
LBA - X-frames under construction
LBA - back view
BM gen - summer pump
NER70 - old floor
MF - fore ballast
NER70 - last layer
HHD - afternoon shift
BR GW - latest view
NRMv - NER70 - loco No.1
NRMv - NER70 - Single Driver
A&P -3315
A&P - steam trials
MF - galley in here
MF - cabin close up
MF - rebuilt galley
GT - 108 glue test
MF - full cabin, forward, after refit
MF - cabin and galley
MF - Afloat in Scotland
MF - new cabin roof
MF - Ashore for work
MF - new galley
MF - looking forward
GT - 101 glue test
MF - Exterior view
GT - 102 glue test
GT - 106 glue test
WR - Dunbar 200
BC - steaming
WR - Dunbar from the Quay
BR DB - demolition in progress
BC - grafts
WR - into Whitby 1
BR DB - work starts
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
454 visits
GT - 107 glue test


twang !!!
and, finally, the test peice failed.
When examined carefully, it was not the glue that was at fault.
and, finally, the test peice failed.
When examined carefully, it was not the glue that was at fault.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter