Boat going through Neptunes Staircase at Banavie 1…
Ben Nevis & Coire Leis from Banavie 18th April 201…
The Ben 18th April 2017
Bridge Ahead Caledonian Canal,18th April 2017
Bridge Open "Full Ahead"
Loch Lochy
Commando Memorial,Spean Bridge 18th April 2017
Garden of Rememberance,Commando Memorial,Spean Bri…
Glen Nevis Lower Falls 18th April 2017
Sgurr a`Mhaim from Glen Nevis 18th April 2017
Inverness Castle 19th April 2017
Another angle on Inverness Castle 19th April 2017
Loch Ness 19th April 2017
River Oich,Ft Augustus 19th April 2017
DRS class 68 68022 RESOLUTION with 1Z68 Pathfinder…
DRS class 68 68022 RESOLUTION on the returning 1Z6…
Glen Coe 20th April 2017
Beinn Fhada & Gearr Aonach,Glen Coe 20th April 201…
Gearr Aonach & Aonach Dubh,Glen Coe 20th April 201…
Loch Tulla 20th April 2017
Beinn Dorain with it's top in cloud 3530Ft 20th Ap…
Kilchurn Castle,Loch Awe 20th April 2017
Cal Mac Ferry M.V. CORUISK leaving Oban 20th April…
Ben Nevis from a Cruise Boat on The Caledonian Can…
LMS class 5 44806 climbing from Grosmont up to Esk…
LMS Royal scot class 46100 ROYAL SCOT at Esk Viadu…
LMS class 5 45212 climbing away from Grosmont with…
LMS Royal Scot class 46100 ROYAL SCOT at Darnholme…
Tranquill morning at Onich 23rd October 2003
Loch Linnhe from Onich 21st October 2003
DRS class 37`s 37259+37609 with 6K74 09.09 Sellafi…
DRS class 66`s 66434+66305 with 4S43 06.40 Daventr…
Jubilee 46590 LEANDER with 1Z78 05.54 Scarborough…
46115 SCOTS GUARDSMAN with 1Z32 06.36 Manchester V…
Deadwood main street South Dakota USA 10th Septemb…
Deadwood South Dakota USA 10th September 2011
Mount Rushmore National Memorial,South Dakota USA…
Mount Rushmore National Memorial South Dakota USA…
Crazy Horse Memorial.What the Finished monument wi…
Crazy Horse Memorial South Dakota USA 9th Septembe…
Crazy Horse Memorial South Dakota USA 9th Septembe…
Lakota Sioux Indian Memorial Little Bighorn Nation…
Arikara Indian Memorial Little Bighorn Nationa Mon…
The Glen Canyon Dam from the Air 19th September 20…
Flying over Lake Powell,Arizona,USA 19th September…
Location
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
You can copy the above to your favourite mapping app.
Address: unknown
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
203 visits
Neptune`s Staircase Banavie 18th April 2017


Neptune's Staircase (grid reference NN113769) is a staircase lock comprising eight locks on the Caledonian Canal. Built by Thomas Telford between 1803 and 1822, it is the longest staircase lock in Britain. The system was originally hand-powered but has been converted to hydraulic operation.
Neptune’s Staircase at Banavie, near Fort William just north of Loch Linnhe, is kept by Scottish Canals. It is the longest staircase lock in Britain, lifting boats 64 feet (20 m). It consists of eight locks, each 180 feet (55 m) by 40 feet (12 m), and it takes boats about 90 minutes to pass through the system.
The current lock gates weigh 22 tons each, and require a team of at least three lock-keepers to operate the staircase. They usually operate on an "efficiency basis"; that is, they try either to fill each cut with ascending boats or with descending boats, or to allow for passing, i.e. a dropping craft to pass a rising craft on the same fill/empty cycle.
Prior to mechanisation, the locks were operated by capstans, each with four poles, which had to make seven full revolutions to open or close a gate. Each gate leaf had two capstans, one to open it and another to close it. There were 36 capstans on the flight, and 126 revolutions were required for a boat to travel up or down the complete flight. With the advent of hydraulic rams and push-button control, transit times through the flight have been reduced from just over half a day to 90 minutes. The base plinths of the original capstans can still be seen, although the capstans themselves have been removed.
Neptune’s Staircase at Banavie, near Fort William just north of Loch Linnhe, is kept by Scottish Canals. It is the longest staircase lock in Britain, lifting boats 64 feet (20 m). It consists of eight locks, each 180 feet (55 m) by 40 feet (12 m), and it takes boats about 90 minutes to pass through the system.
The current lock gates weigh 22 tons each, and require a team of at least three lock-keepers to operate the staircase. They usually operate on an "efficiency basis"; that is, they try either to fill each cut with ascending boats or with descending boats, or to allow for passing, i.e. a dropping craft to pass a rising craft on the same fill/empty cycle.
Prior to mechanisation, the locks were operated by capstans, each with four poles, which had to make seven full revolutions to open or close a gate. Each gate leaf had two capstans, one to open it and another to close it. There were 36 capstans on the flight, and 126 revolutions were required for a boat to travel up or down the complete flight. With the advent of hydraulic rams and push-button control, transit times through the flight have been reduced from just over half a day to 90 minutes. The base plinths of the original capstans can still be seen, although the capstans themselves have been removed.
Ste has particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Best wishes ... Steve
Alan Drury club has replied to SteSign-in to write a comment.