66045 - floor progress
20 Mar 2023 |
|
Some further progress on installing the floor planks - the undersides and edges are pre-painted.
BR971 - hopper one end slope
28 Feb 2018 |
|
|
Quite some time has been spent building the support frames and other parts for the internal hopper for the waggon [the arson attack left limited evidence for the structure]. It has also been prefinished with stain and a semi-matt varnish to protect the timber. This one end slope is now all present and correct.
BR971 - finished trap door
28 Feb 2018 |
|
One of four trap doors - just need to trim the ends of the blots flush - before hanging from the pivot bar, which is underneath the centre spine.
Apologies for the soft focus, the pointnshoot camera was having an off-day for some reason.
BR971 - chassis part built
28 Feb 2018 |
|
Another view of the part built chassis. Visible are the mortice pairs for the spring support fans and various bolt and tie-bar holes.
BR971 - fans fitted
28 Feb 2018 |
|
These fans support the main coupling springs, note the bolted down metal retaining strips.
BR971 - underframe 6
28 Feb 2018 |
|
Cutting the corner, followed by the angled tenon pairs on the end of the last fan timber.
BR971 - underframe 7
28 Feb 2018 |
|
|
The last of the eight fan timbers having the angled tenon pairs cut, almost ready for a full dry fit, after cutting the requisite mortices - but without the tie-bars.
And then a good sweep up of the floor !
BR971 - underframe 5
28 Feb 2018 |
|
One of the two long side cill timbers for the green oak underframe. Not a small, nor lightweight piece of wood.
BR971 - underframe 4
28 Feb 2018 |
|
Getting ready to lift the green oak for the side cill up to a workable height.
BR971 - underframe 3
BR971 - underframe 2
28 Feb 2018 |
|
|
Detail of the paired tenons on one end of the side cill timber. This is green Oak, which is an unseasoned timber and somewhat heavy to work, both in weight and technique.
BR971 - underframe 1
28 Feb 2018 |
|
The short lengths of green oak, for the internal parts of the underframe.
BR971 - body demolished
28 Feb 2018 |
|
The partially burnt remains of almost all of the bodywork had now been removed. After the last pieces are dealt with, it will be time to record details of fixings and then dismantle the underframe.
.
The new green oak underframe is being worked on concurrently.
Jump to top
RSS feed- StoneRoad2013's latest photos with "woodwork" - Photos
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter