StoneRoad2013's photos with the keyword: timber repair

CF - joint 3

19 Dec 2018 271
Third of three images showing repairs to a structural upright, methodology is to retain the maximum original material. The inner surface was also in fairly poor condition, again largely from impact damage. As before, a thin layer was machined away and a replacement layer glued in position and trimmed to fit.

CF - joint 2

19 Dec 2018 265
Second of three images showing repairs to a structural upright, methodology is to retain the maximum original material. The outer surface was in fairly poor condition from largely impact damage, so a thin layer was machined away and a replacement layer glued in position and trimmed to fit. Note: the replica roof stick above has been laminated - greater strength and more economical use of timber - the surface profile will be machined before it is jointed into the cant rail.

CF - joint 1

19 Dec 2018 266
One of three images showing repairs to a structural upright, methodology is to retain the maximum original material. Stage one is to replace the tenons or the area holding the mortices ie the joints, using suitable piece of Oak, to match the existing original timber.