BM FC - Undercoated Ironwork
olb - at Port Penrhyn
TiG - Honister Baguley
TiG - pointwork
oaw - ducks on a tarn
gbw - garden snowdrops
FU - Ian and John Craven
FU - Heritage Heroes
gbw - lakes snowdrops
oad - two sheep
oad - lamb pipe
oad - Herdwick flock
oad - feeding lambs
oad - resting lambs
oad - curious lamb
gbw - spring lakes
gbw - spring pollard
MF - clearview inside
MF - engine as found
MF - clearview outside
MF - stern and rudder
BDD - waiting with ball
BDD - the big adventure
BM FC - before and after joint
BM FC - before and after paint
BM FC - green paint
BM FC - ready to fit (b)
BM FC - ready to fit (a)
BM FC - final bench fit
TiG - tiny caravan
TiG - Icebreaking Canal Tug
BDD - wot U doin' ?
CF - K1 - Lord of the Isles aka 62005
BM FC - close up primed bufferbeam
BM FC - primed headstock
BM FC - upright joints
BM FC - going together
gbw - crystals in close up
gbw - frosty boat
gbw - winter sunrise
gbw - morning has broken
mods - IDY - landy cab in close up
BM FC - rotten wood removed
BM FC - no headstock
BM FC - dry fitted end cill
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
319 visits
BM FC - joint fitted (side view)


Side view of the repaired corner post. Further areas are receiving primer and various surface repairs have been done.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.