BM FC - joint fitted (side view)
BM FC - Undercoated Ironwork
olb - at Port Penrhyn
TiG - Honister Baguley
TiG - pointwork
oaw - ducks on a tarn
gbw - garden snowdrops
FU - Ian and John Craven
FU - Heritage Heroes
gbw - lakes snowdrops
oad - two sheep
oad - lamb pipe
oad - Herdwick flock
oad - feeding lambs
oad - resting lambs
oad - curious lamb
gbw - spring lakes
gbw - spring pollard
MF - clearview inside
MF - engine as found
MF - clearview outside
MF - stern and rudder
BDD - waiting with ball
BM FC - before and after paint
BM FC - green paint
BM FC - ready to fit (b)
BM FC - ready to fit (a)
BM FC - final bench fit
TiG - tiny caravan
TiG - Icebreaking Canal Tug
BDD - wot U doin' ?
CF - K1 - Lord of the Isles aka 62005
BM FC - close up primed bufferbeam
BM FC - primed headstock
BM FC - upright joints
BM FC - going together
gbw - crystals in close up
gbw - frosty boat
gbw - winter sunrise
gbw - morning has broken
mods - IDY - landy cab in close up
BM FC - rotten wood removed
BM FC - no headstock
BM FC - dry fitted end cill
BM FC - new and old end cills
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
280 visits
BM FC - before and after joint


The end of the corner post which was deemed in need of replacement, as the tennon was rotten, and the mortice in the cill had disappeared as the cill was very rotten.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.