MF - helm progress 1
BDD - throw the ball
BDD - chasing the ball
BDD - natural state
BDD - almost missed
BDD - space to run
BDD - paddling
olb - Mary Joicey 2011
olb - Newbiggin by the Sea
gbw - tide by moon
gbw - high tide
olb - Zetland
olb - Longstone light
oaw - seal on Farnes
1001 - canal joey
1001 - single deck tram
1001 - tram interior
olb - 37-17 side view
BDD - fetch a stick
BDD - really swimming
BDD - playtime
BM FC - side panels
BM FC - preparation
BM FC - frame repair
BM FC - panel joint test
BM FC - panel joints
BM FC - panel rebuild
HHD - sunshine dog
WR - maker's plate
olb - portpatrick 2006
olb - solent
olb - T50 side view
olb - Thomas Kirk Wright
olb - Mary Joicey at Beale Park (2004)
olb - Chieftan at Wells next the Sea
oaw[HH] - hedgepig ; rescued late 2008
olb - connection
olb - experimental lifeboat
olb - supercat at Hoylake
olb - Thomas Corbett
O&S - coin balanced
wild - rocks and goat
wild - goat close up
BDD - hard life
BDD - getting in the car
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
365 visits
MF - helm progress 2


The helm has been substantially rebuilt, allowing rationalisation of additional and original equipment. As seen from near the chart table in the other corner of the wheelhouse. The boat has now been covered for the winter.
I should point out that all the quipment, including the wheel, is removed at night.
I should point out that all the quipment, including the wheel, is removed at night.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.