WR - oops ....... or should that be "OUCH"
STR - finial at alston 2
NRM Bobo - unpainted
BR DB - sunny wait
WR - at Poole 1
NRM DS - finally in use
No.25 - loaded and ready to go
BR DB - final finish
NRM SP - old footplate
HHD - PA - workshop fore-dog
NRM SP - footplate in place
WR - hull after 2
MF - View aft ; before refit
MF - Cabin to wheelhouse (aft - refitted)
BC - buffet car in a field
WR - internal finish - varnished deck
PA - armchairs in use
WR - William Riley at Barnstaple
BC - bodywork
DT - coffee format
PA - armchair detail
No.25 - sapele carriage kit
NRM DS - headstocks
BM CV - boss and chips
BR GW - burnt
BM gen - make a copy of this
BM gen - Pump treated
BM BV - As arrived
SRR - signboard
H&S - using 'blacklight'
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
440 visits
No.25 - seats at the end


Almost finished. Perhaps another coat of varnish?
By the time this carriage gets to Wales, all that will be needed inside will be the passengers.
Before it can enter service, however, it will require wheels, brakes and drawgear.
By the time this carriage gets to Wales, all that will be needed inside will be the passengers.
Before it can enter service, however, it will require wheels, brakes and drawgear.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.