Engines and engineering
B.J.Ry
Preparation
Main entrance
Whitlingham kiln
Hinkley Point C
9351
West Burton
Drilling
Red Butts Mine
Tufts Junction
Bahamas
Crushing and grading
Sweets
Library
Penyghent
Megaliths
Ironworks
Zeche Rheinpreußen shaft 8
Yarmouth Hippodrome
Stoneacre loop
Caister Road bus depot
Delabole
Limekilns
Failed
Lost power
Yr Eifl
Namtu yard
Smeaton's Tower
Servicing
PPE
Dredging
Quarry Demo
Llandudno Station
Waverley
Clock on the Seacombe Ferry Terminal
Wind farm
Digestion
Loading
Cement ingredients
Old station
Towards Tuoyaozi
Spotland Bridge (New) Mill
Latter days of the 507s
Buttressed
Location
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
You can copy the above to your favourite mapping app.
Address: unknown
See also...
See more...Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
188 visits
Kiln based


The Great Western Railway built a water tank and pumping station on top of a pair of kilns. Firepool limekilns, Taunton. The kilns were built in the early 1840s at a point where the Bridgwater and Taunton Canal meets the river Tone adjacent to a coal and Culm Wharf established following the arrival of the Bristol and Exeter Railway in 1842. The pumping building dates from c1866 and the tank on top from 1877. Grade II listed.
The ghost sign on the tank reads Van Heusen who were locally based shirt manufacturers.
The ghost sign on the tank reads Van Heusen who were locally based shirt manufacturers.
A Buildings Fan, Erhard Bernstein have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.