Coal empties leaving Baofeng
Weaver Church, Weston Point
The Railway, Latchford
Pingdingshan winter (2)
Eight towers
The Railway, Latchford - detail
Gig Hall bridge
Non-stop through Gulumanhan
Hatfield Colliery
Beichang Washery
On the furnace line
Dyeworks farewell
Sir George Earle before the storm
Aynsley in blue
Mixed train
Acme Marls - Kilns
Linghe Mine
Queen Anne
Looking up
The old and the new
Carriage cleaning
The end of the line
No fuel
Hope cement works quarry
Earle's Cement
Steaming in the rain
Anderton Company
Park St from Market Place, Stockport
Early morning at the salt mine
Shutlingsloe from Wincle Minn
Standard Goods Superheated
On the dirt tips
Mill Meece Pumping Station
On its way
Ready to go
Bullstones
Pingzhuang depot
Lancashire boiler
Redcar
Westbound out of Malakwal
Mongolian Landscape
Into the loop
Adderley Green Gasholder
Approaching Moore
Albion Hotel
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
191 visits
Pingdingshan winter


As I learn that steam on the Pingdingshan system has now been relegated almost entirely to a standby role I thought that I would dig out a shot from January 2008 which encapsulates the often dark and gloomy atmosphere there. Here JS 8030 lurks in the background at Tianzhuang whilst the track gang labour on the extensive track doubling that was being undertaken in this area. The weak and hazy sun is about as good as it gets for days on end. I made three visits to this busy railway operation and never managed to see all it had to offer but always enjoyed seeing the big trains operated here.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.