StoneRoad2013's photos with the keyword: K7

BBH - primed

10 Mar 2017 2 444
The four timber strips have now been primed, and are ready to go back to The Bluebird Project workshop.

BBH - plug details

10 Mar 2017 1 1 428
Close up / detail image of the holes after filling with timber plugs.

BBH - holes filled

10 Mar 2017 3 3 606
Another view of the plugged holes.

BBH - holes 3

09 Jan 2017 1 318
These timber strips contained many fixings, in the lower one these are still in place and in the upper strip they have been drilled out.

BBH - holes 2

09 Jan 2017 1 312
These timber strips contained many fixings, in the lower one these are still in place and in the upper strip they have been drilled out.

BBH - holes 1

09 Jan 2017 1 318
These timber strips have had many fixings placed in them, the lower one has had these levered out, the upper ones were drilled out.

BBH - four pieces 01

08 Jan 2017 308
Four timber strips, leaning up against the hull.

BBH - four pieces (again)

08 Jan 2017 301
These are the four timber strips, standing against the hull

BBH - location detail

08 Jan 2017 331
Close up of one of the four timber strips, resting in position.

BBH - these fit here

08 Jan 2017 318
Holding one of the timber strips in position.

BBH - four edge strips

08 Jan 2017 297
Bluebird has four timber strips, two run along the top edge, the other two at the bottom. These are the means of jointing the side and bottom of the hull. Bluebird is in a rolling jig, with her starboard side uppermost and the bottom of the boat facing the camera.

BBH - engines

08 Jan 2017 164
The two globes on the nearest engine are the pressure vessels for the compressed air start system.

BBH - symbol

08 Jan 2017 194
One of the interesting logos to be found around the Campbells and their speed machines.