TRv6 - unloading {1 of 2}

05 Dec 2023 1 99
Having arrived at Wharf Station, it is now 10:00 on the 5th December 2023 - and time to start shunting the low-loader and decant the van and the waggon. Snipped off Wharf's webcam.

TRv6 - unloading {2 of 2}

05 Dec 2023 99
Image from the TR staff of the low-loader shunting around the yard at Wharf Station [timed 10:45] - just prior to decanting both the van and the waggon. Not my image : fair use & public information

TR6 - located (delivery 9/9)

30 Jan 2021 1 145
Positioned ready for work to begin, first job is to fit the tarpaulin cover. Something will need to be done with that puddle by the wheels nearer to the blue doors.

TR6 - almost down (delivery 6/9)

30 Jan 2021 1 126
TR6 almost ready to touch down.

TR6 - coming down (delivery 5/9)

30 Jan 2021 1 133
Using the tractor unit as a brake / counterbalance whilst pulling TR6 off the trailer.

TR6 - ramp laid out (delivery 3/9)

30 Jan 2021 1 133
The team from the TR are laying out the unloading ramp and starting to pack under the rails.

TR6 - (delivery 1/9)

30 Jan 2021 1 129
Thompson's tractor unit has pulled clear from the swan neck trailer. (and it has stopped raining)

TR6 - and along (delivery 8/9)

30 Jan 2021 1 126
TR6 making careful to the intended location.

TR6 - and down (delivery 7/9)

30 Jan 2021 2 124
The first pair of wheels are down, and TR6 will happily roll along to the designated spot.

TR6 - unloading (delivery 4/9)

30 Jan 2021 1 126
Checking that everything is ready for TR6 to roll down the ramp.

TR6 - beginning (delivery 2/9)

30 Jan 2021 1 152
Rails pulled out to begin building the unloading ramp

BR971 - just fitting

14 Dec 2017 347
Well, it fits, just. The distortion from the arson damage is not too bad, but it doesn't help !

BR971 - will it go

14 Dec 2017 332
Lining the waggon up with the workshop doors, with a nifty bit of formation fork-lift work ...

BR971 - turning

14 Dec 2017 363
Having got if off the delivery vehicle, now the coal waggon needs to be turned to face into the workshop. Not as easy as it sounds, as the arson damage is quite severe.

BR971 - arrival

14 Dec 2017 363
The low loader has brought 971, now the two forklifts have got the waggon's remains up high enough that the low loader can draw forward, out of the way.

NSR228 - tarp undone

10 Mar 2017 376
Just undoing corners, to make sure we can get at everything when the carriage is inside. We did remove the tarp once the carriage was inside and protected from the showery weather.

NSR228 - underside 02

14 Dec 2017 1 433
The second of two posted images showing the underside of the floor and cill structure.

NSR228 - underside 01

14 Dec 2017 1 650
We took advantage of the lift to capture some images of the underside of the floor and cill structure. (Only two have been posted)