StoneRoad2013's photos with the keyword: compartment 2

TR6 - Cmpt2 ; bulkhead painting

10 Feb 2021 119
Cmpt 2 : The interior red-brown undercoat has been sanded back, prior to the application of an initial coat of gloss. After that is dry, the seats will be built. Note that there is still a little work due to the roof, before the ceiling panels are re-installed.

TR6 - roof problems [7 of 9]

30 Jan 2021 1 146
Another small area of rotten wood on the edge of this plank. It has already been painted with a timber preservative.

TR6 - roof problems [6 of 9]

30 Jan 2021 1 168
Cmpt 2. Small area of rot in one of the narrow planks (these are to allow the degree of curvature required) The lighter coloured wide planks are likely to be from previous repair work.

TR6 - floor (compartment 2)

30 Jan 2021 1 154
A few patches and other repairs to the floor - plus some areas of severe wear just inside the doors.

TR6 - door to Cmpt 2

30 Jan 2021 1 134
Doors to Compartment 2 already work, but may need minor repairs. Looking from just inside compartment 3 towards the existing bulkhead (between cmpts 1 & 2), this will need the gap filling and new, full-width bench seats.

TR6 - site of new bulkeads

30 Jan 2021 1 125
compartment 2. there will be a new floor to ceiling bulkhead fitted into the middle of these paired back to back seats

TR6 - interior ; almost full length

30 Jan 2021 2 156
Taken from the bulkhead opening between compartments 1 & 2, looking towards compartment 5 at the further end. The central part of the full width seat is visible through the opening in the bulkhead between compartments 4 & 5. Internal work to be done [summary] - infilling the two bulkhead openings, fitting two new bulkheads [2 & 3 and 3 & 4] replacing all the seat units with full-width bench seats, and making all the doors work ; which includes one totally new door, in compartment 1. And a repaint ...