StoneRoad2013's photos with the keyword: Privy compartment

NER70 - Door and bulkhead panelling finished

07 Feb 2020 3 2 365
Almost the final result - just needs a suitable door knob. The owner has one stashed away somewhere. . Posted with Permission

NER70 - Door in bulkhead

07 Feb 2020 3 328
Looking down the saloon to the door and bulkhead that separate the privy compartment. Only a couple of minor details left to finish off. . Posted with Permission

NER70 - Thunderbox built

07 Feb 2020 4 303
Fitting the "Thunderbox" together. Note : the panelling and beadings for the bulkheads in the Privy Compartment are complete, the areas around the droplights are still to complete. . Posted with Permission

NER70 - Thunderbox front panel

07 Feb 2020 2 1 281
The completed front panel, matching the style of the bulkeads, for the "thunderbox" - now to be a battery box. Designed to be demountable, it is now ready to fit, but will need a little more varnish first. . Posted with Permission

NER70 - Saloon / Privy compartment bulkhead

07 Feb 2020 1 250
The pre-varnished sapele beadings are now being added over the oak faced plywood which forms the saloon side of the bulkhead separating the privy compartment. . Posted with Permission

NER70 - Sink area, Privy Compartment

07 Feb 2020 1 247
The lower part of the area in which the sink will be located has been panelled in a style similar to being "matchboarded". . Posted with Permission

NER70 - Thunderbox framework

07 Feb 2020 1 264
Framework for the "thunderbox" in the early stages of construction, including the surrounding beadings. This is what would have been a very primitive WC, draining directly to the track, when originally built. To comply with modern safety and health provisions, it will be repurposed as a battery box for the carriage lighting. . Posted with Permission

NER70 - partition doorframe

07 Feb 2020 1 275
22 clamps being used to apply pressure as part of the privy compartment's door frame is being constructed, this will be the hinge side. . Posted with Permission

NER70 - Privy Compartment panelling

07 Feb 2020 1 261
Partially completed beading, this needs to be integrated with the fixtures (ie sink and thunderbox) before it can be fully finished. . Posted with Permission

NER70 - End bulkhead panelling in progress

07 Feb 2020 1 243
This is the full bulkhead (the other side is the outside of the carriage) in the privy compartment as the beadings are attached. A considerable amount of work has been done before this image could be taken, both on preparing the end framework to accept the panelling and on the panelling components themselves. . Posted with Permission.