StoneRoad2013's photos with the keyword: EHSI Placement

BJ - attaching metalwork to cabside

16 Mar 2013 399
The metalwork on the inside of the stoker's half of the cab is now fixed in place.

BJ - varnishing coach

16 Mar 2013 379
Applying a coat of protective varnish over the scumble.

BJ - finishing brackets

16 Mar 2013 401
Touching up the bolts and brackets.

BJ - cleaning up joint

16 Mar 2013 386
Becky removing some excess glue from a joint in a repaired vertical.

BJ - lower tenon

08 Feb 2013 375
Becky trimming the joint on the replacement lower tenon belonging to the central upright, to be followed by finishing the support slot for the central (full height) partition.

LW - scraper work

08 Feb 2013 354
Lee scraping off a thin layer of lichen / paint from the side module that has just started a journey along the repairs production line