StoneRoad2013's photos with the keyword: DJM Fabrications
underframe 106
24 May 2011 |
|
The main underframe for No.25 is now welded together.
Source: DJM Fabrications
underframe 105
24 May 2011 |
|
Internal view of the end section.
Looking from the drawgear aperture down the length of the underframe.
Source: DJM Fabrications
underframe 102
24 May 2011 |
|
Another selection of parts ready for fitting. These are the components that make up the undertruss bracings, which stop the chassis sagging under the load (this includes its own weight plus the timber superstructure plus a full load of passengers).
.
Source: DJM Fabrications
underframe 101
24 May 2011 |
|
A selection of the underframe components, cut out ready for fitting and then welding as fabrication proceeds.
Source: DJM Fabrications
underframe 103
24 May 2011 |
|
Close up of one of the welds at the ends of one of the main stretchers.
Source: DJM Fabrications
underframe 110
24 May 2011 |
|
Both underframes are now being secured, ready for the transport firm to load them onto their 'low-loader' that will take them to Wales.
Source: DJM Fabrications
underframe 107
underframe 108
24 May 2011 |
|
|
Turning the frame for access to the other side.
Source: DJM Fabrications
underframe 109
24 May 2011 |
|
The first of the pair of underframes has now been primed, and is being stored outside whilst the second one is built.
Source: DJM Fabrications
underframe 111
24 May 2011 |
|
Both underframes have been unloaded onto accommodation bogies so they can be moved around Gelert's Farm, and into the WHHR workshops.
Source: Not known
underframe 104
24 May 2011 |
|
The number 9 is the alternative identity for the replica Ashbury (aka No.25)
Source: DJM Fabrications
Jump to top
RSS feed- StoneRoad2013's latest photos with "DJM Fabrications" - Photos
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter