StoneRoad2013's photos with the keyword: floor

BDD - on the floor

28 Aug 2022 81
After a walk, Ben's decided that this patch of floor is now the best place to lie down, as it is cool ! Sadly, not the best of shots as a) the camera settings weren't correct and b) I was laughing so much the camera was being shaken about.

1986 - floor plank fitting.

17 Jul 2022 65
SW fitting floor planks together for 1986

1986 - floor planks

17 Jul 2022 62
Floor planks laid over the underframe, some overhang has been allowed, in case of shakes or splits. These will be cut to their final length shortly.

TR6 - floor (compartment 2)

30 Jan 2021 1 152
A few patches and other repairs to the floor - plus some areas of severe wear just inside the doors.

MRT - refurbished floor plate

02 Oct 2020 3 154
We discovered that wooden floor planks between the two sets of steel floor plates (ie - a steel wood steel sandwich) were mostly rotten. As part of the renewals, the three floor plates were de-rusted and painted with red-oxide.

NSR23 - pass end up & primed

21 Aug 2018 1 461
The two layers of floor planks have been fitted to the cill frames (laid in the double diagonal format). Passenger end and the two end "quarters" have been erected and glued up before primer was applied.

RERM - bs - fitting the floor

28 Oct 2017 234
All go, as work proceeds on adding the floor (now stained and varnished). The other exhibits are also taking shape around the "Big Saloon" - the ironwork alongside are the side water tank and part of the frames of early steam locomotives from the R&E Railway.

RERM - bs - floor and some side sections

28 Feb 2018 283
Almost all the floor planks are laid and the side sections are arriving. Some are lighter than others and need the cant rail and roof sticks to maintain proper positioning.

RERM - bs - interior planks

28 Feb 2018 1 262
Almost all the woodwork is finished now, just the roof to dry fit. Cutting the air vents was an interesting exercise.

RERM - bs - new floor

28 Feb 2018 1 254
A brief interlude of simple work - laying the floor planks. A neat and satisfying job.

NSR228 - underside 02

14 Dec 2017 1 432
The second of two posted images showing the underside of the floor and cill structure.

NSR228 - underside 01

14 Dec 2017 1 650
We took advantage of the lift to capture some images of the underside of the floor and cill structure. (Only two have been posted)