tarboat's photos with the keyword: pingzhuang

Ready for coaling

10 Feb 2022 4 184
Morning shift change with SY 1083 at the servicing point on the Pingzhuang Coal Railway and about to move forward for the the tender to be filled using the grab.

New Mine

09 Jul 2021 1 256
After a hard day chasing steam around the mining districts of Pingzhuang we were heading for Chifeng and the train back to Beijing when this new colliery appeared in front of us at Xiliujiacun. The mine was still opening out and the headgears are just for sinking purposes.

Pingzhuang coal

09 Oct 2017 1 2 442
Trains on the northern end of the Pingzhuang mining railway tended to be few and far between so it was lucky that we were able to find SY 0400 passing Gushan No.1 mine with a loaded train.

Pingzhuang

22 Aug 2017 2 509
Deflector fitted SY 1083 is on the final approach to the exchange sidings at Pinzhuang Nan with a loaded coal train.

Pingzhuang opencast

03 Dec 2015 5 3 617
The opencast coal mine at Pingzhuang was reaching the end of its life when I visited in 2008. The coal was worked from the pit in electrically hauled trains whilst maintenance trains were steam hauled. Coal production in the area continues from deep mines.

Running repairs

21 Mar 2012 3 4 339
SY 1487 and SY 1052 undergo repairs in the workshops of the Pingzhuang mining railway. This is still a stronghold of steam in China being entirely operated by SYs outside the opencast pit.

Morning preparation

02 Dec 2010 278
Steam is still in use at the Pingzhuang collieries although action can be hard to find at times. Two SYs are being prepared for work at the servicing point adjacent to the washery. The loco coal supply is protected from the predations of the locals by the heavy sliding covers for the storage pit under the grab gantry.

Pingzhuang crossing

20 May 2009 231
A deflector fitted SY drops across the road with a long load of empties from the China Rail exchange sidings at Pingzhuang Nan.

Pingzhuang depot

02 Sep 2008 171
Dark and gloomy but very atmospheric. SY1052 on test inside the maintenance depot of the Pingzhuang coal railway.

Pingzhuang washery

13 Apr 2008 185
SY 1017 makes an early morning departure at the Pingzhuang washery.

Pingzhuang action

22 Feb 2008 307
Deflector fitted SY1083 charges across the bridge on the incline towards the China National Railways interchange at Pingzhuang Nan with a long rake of loaded coal wagons. The Pingzhuang system on the edge of the Mongolian Autonomous Region is still completely steam worked, with a well maintained fleet of locomotives.

Chickens

30 Jan 2008 1 292
Pecking at a seam in the Pingzhuang opencast coal mine, Mongolian Autonomous Region.