tarboat's photos with the keyword: waste
Enfinium 1
26 Oct 2024 |
|
|
Power from waste company Enfinium operates two power stations at Ferrybridge. Each site processes up to 725,000 tonnes of residual waste per annum whilst generating up to 85MW of electricity which is sent to the National Grid. The company operates a total of six such units around the UK.
Tufa
18 Feb 2024 |
|
|
Tufa calcite deposits below the vast lime waste tips at the former Harpur Hill limeworks of Buxton Lime Firms Ltd. Great care has to be taken around these deposits due to the high alkilnity of the water which exceeds pH 12 in the lagoon immediately below the tips.
The following explanation is taken from this fascinating report.
The Harpur Hill Site: its geology, evolutionary history and a catalogue of materials present
Report number: CR/13/104 British Geological Survey Commissioned Report, May 2015.
Authors:
Antoni Edward Milodowski, British Geological Survey.
Douglas I Stewart, University of Leeds.
www.researchgate.net/publication/289335354_The_Harpur_Hill_Site_its_geology_evolutionary_history_and_a_catalogue_of_materials_present
The site at Harpur Hill was developed in the 1830’s for the large scale production of lime for the agricultural, building and chemical industries, which continued until the early 1950’s when production on this site ended. Lime production was an inefficient process leading to the creation of large amounts of waste in the form of under- and over-burnt limestone, lime fines, and ash from the low quality local coal used in the process. This waste has been deposited in tips at a number of locations at Harpur Hill, one of the larger tips being created by ‘tumble tipping’ over the side of the Brook Bottom valley, close to one of the banks of lime kilns. The valley carries an ephemeral stream at this location, which has been culverted under the tip, though the culvert is now largely blocked by calcium carbonate deposited within it.
Because the waste is partly comprised of calcined limestone, it reacts with water which hydrates the burnt lime and forms a calcium hydroxide-dominated leachate with a pH of greater than 12. The leachate migrates through the tip and emerges from its base into the Brook Bottom valley. Here, contact with atmospheric carbon dioxide and mixing with local bicarbonate water leads to precipitation of calcium carbonate. This has led to the development of an extensive tract of fine grained and soft tufa deposits of calcium carbonate over a large area of the valley bottom downstream of the spoil tip. Where largely undiluted by fresh water, the fluid in the resulting lagoon in the vicinity of the tip base maintains a high pH (>12). Mixing with fresh water inflows and uptake of atmospheric carbon dioxide occurs as the surface water flows downstream, resulting in continued calcium carbonate deposition and pH reduction. Most of the precipitation of calcium carbonate occurs in the first 400 m or so and the alkalinity, except in dry weather conditions, drops to around pH 8 over this distance. However small amounts of calcium carbonate deposition occurs for up to 2 km downstream.
The leaching of the lime waste by percolating rainwater and shallow groundwater, and the development of the ‘lagoon’ of calcium carbonate precipitate, has probably been occurring since soon after waste tipping on the side of the valley commenced. Precipitation is continuing today, over 60 years since lime production ceased at Harpur Hill, and around 100 years after the bulk of the waste on this part of the site had been tipped and this tip ceased to be utilised for waste disposal (more recently waste has been tipped elsewhere in the quarry complex to the east, including into worked out areas of the quarry as production methods and kiln locations changed).
Collier
02 Aug 2021 |
|
Tanks at the extensive Collier industrial waste processing facility in Trafford Park.
Paper waste
19 Jun 2018 |
|
It has become a regular occurrence to see paper waste being spread on land as a soil conditioner. This mountain was being loaded into spreaders for application onto the fields on the uplands of Lyme Handley.
Harworth Colliery
27 Jun 2015 |
|
|
Harworth Colliery closed in 2006 and was then been kept on care and maintenance by owners UK Coal. At one time there was talk of reopening when the reserves at Welbeck Colliery were exhausted. The two shafts which were sunk in the 1920s were 900 and 1000m deep. There are estimated to be around 40 million tonnes of reserves in the Deep Soft and Top Hard seams. It was probably a surprise to nobody that the colliery has since been abandoned and the structures demolished.
Jump to top
RSS feed- tarboat's latest photos with "waste" - Photos
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter