The railway goes mostly on piles
Trying to shoot (with the photo camera of course!!…
Yuki waiting for the next show
First view at a Manta
The Manta is coming for sure
Mantas don't like air bubbles???
Manta flying over us
Manta's silhouette
Can't stop photo shooting Mantas
Manta and diver
Close to the Manta head
A flying young Manta turns over us
Next capture ... no words, just euphoria
Other Manta Ray appears
Mantas gills
The Mantas surface
A small Manta from above
Playing with the giant Manta
Manta ray in its natural habitat
Mantas fine hairy surface
Harmonic flow of the Manta
Manta with its full wingspread
Touching the Manta is amazing ...
The gate to board the train to Xining
The tickets for a sleeping car
The waiting room in the railway station
Lhasa railway station
The trail on the piles
The map of the railway from Lhasa to Xining
Xining Station Plaza
Arriving Xining railway station on the dot
Railway station in Xining
First view in the early morning ...
We enjoy the food in the train coach
Inside the dining coach
Headstream of the Changjiang River (Yangtze River)
Late in the afternoon
Along the Tongtian River
Bizarre rock strata near Tanggula town
Tanggula Mountain range
Along the Tanggula mountain range
Closer view to the Tanggula Mountain
The first runlet of the Yangtze River
One more view to the snow fields and glaciers
The highway goes beside the train track
Location
Lat, Lng:
You can copy the above to your favourite mapping app.
Address: unknown
You can copy the above to your favourite mapping app.
Address: unknown
See also...
See more...Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
1 300 visits
The Qinghai-Tibet Railway


The total length of Qingzang railway is 1956 km. Construction of the 815 km section between Xining and Golmud was completed by 1984. The 1142 km section between Golmud and Lhasa was inaugurated on 1 July 2006 by president Hu Jintao: the first two passenger trains were "Qing 1" from Golmud to Lhasa, and "Zang 2" from Lhasa. This railway is the first to connect China proper with Tibet Autonomous Region, which due to its altitude and terrain is the last province-level entity in mainland China to have a conventional railway. Testing of the line and equipment started on 1 May 2006. Passenger trains run from Beijing, Chengdu, Chongqing, Guangzhou, Shanghai, Xining and Lanzhou.
, Adam * have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.