Stiffleaf

Stiffleaf club

Posted: 23 Sep 2013


Taken: 01 Nov 2011

0 favorites     0 comments    138 visits


Authorizations, license

Visible by: Everyone
All rights reserved

138 visits


kensington flat, before, during and almost done. . .

kensington flat, before, during and almost done. . .
all gas pipes and electric for upstairs flats re-routed to run along ceiling, water supplies still to be moved after draining entire house pipes. new lintel up ready to be boarded and plastered. this is the living room

Comments

Sign-in to write a comment.