199304Ulantunnel10001

Ulan Line Tunnels

245 visits  |  Translate into English

Folder: Railway Locations and Infrastructure.

Location:
View on map

02 May 2009

7 favorites

13 comments

262 visits

199308Ulantunnel3Up0003

Site visit by potential contractors. Tunnel three (Bylong) Up end. The 375-107 is the distance from Sydney in Kms. The tunnel is single track and is 1.975Km long. August 1993. HWW my viewers for 12/06/24. The earth works, 5 tunnels and numerous bridges were constructed in the 1930s but track wasn't laid until the 1980s in the Sandy Hollow to Gulgong section and is never likely to be laid in the Gulgong to Mary Vale section. The tunnel closest to Sandy Hollow was used as a road between its construction and the track being laid.

02 May 2009

92 visits

199308Ulantunnel4Up0005

Site visit by potential contractors. Tunnel four Up end. August 1993.

Location:
View on map

09 Apr 2011

4 favorites

241 visits

199802BylongTunnel30001

My final visit to this site at the western end of the Bylong No. 3 tunnel on the Ulan line. Operations looked after it from then. See PiP for overhead view of hut. The site was powered by solar and a diesel generator. Solar was limited by the deep, steep sided valley. February 1998.

Location:
View on map

09 Apr 2011

123 visits

199802BylongTunnel30002

The Bylong No. 3 Tunnel is 1.95 Km long and straight. February 1998.

18 Oct 2011

178 visits

199310UlanTunnel20002

Initial site visit to belt a Train Radio hut location peg into the ground across the track from the Patrol (see note). October 1993.
14 items in total