Treeton Colliery 1977
Folder: Mining and quarrying
This set of pictures mostly shows some early stages in the construction of the new Suface Drift at Treeton Colliery on the east side of Sheffield. At that time, workings in the Swallow Wood seam were over 4 km from the pit bottom, and only reached by a tortuous journey underground that could take as much as an hour.
The Surface Drift changed all that. When it was finally completed around 1980 (… (read more)
The Surface Drift changed all that. When it was finally completed around 1980 (… (read more)
Treeton Colliery October 1977
As well as a general view of the colliery looking south, this shot shows the portal area of the Surface Drift under construction. This near-surface portion is now partly covered in colliery spoil and will eventually be landscaped.
This area is now a posh housing estate.
Treeton Surface Drift 26 October 1977
Here, the portal area is now completed and the main tunnelling work is well under way.
Treeton Surface Drift construction July 1977
This shot shows the portal area of the Surface Drift under construction. The steel arch girders are being encased in concrete. Eventually this near-surface portion will be covered in colliery spoil and landscaped.
Treeton Surface Drift construction 16 June 1977
This shot shows the portal area of the Surface Drift under construction in 1977. The steel arch girders are being encased in concrete. Eventually this near-surface portion will be covered in colliery spoil and landscaped.
Treeton Surface Drift construction 16 June 1977
This shot shows the portal area of the Surface Drift under construction. The steel arch girders are being encased in concrete. Eventually this near-surface portion will be covered in colliery spoil and landscaped.
Treeton No.1 Shaft headgear
The steel headframe and pulley wheels over the No.1 (downcast) shaft. This shaft was mostly used for coal winding and the open lattice construction of the headframe allowed fresh air to enter the mine workings.
Treeton Surface Drift construction 16 June 1977
This shot shows the portal area of the Surface Drift under construction. The steel arch girders are being encased in concrete. Eventually this near-surface portion will be covered in colliery spoil and landscaped.
Jump to top
RSS feed- Latest items - Subscribe to the latest items added to this album
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter