
{OK} (E)HSI - AR (4)
1 comment | 802 visits | Translate into English
Folder: Training - ENGINEERING HERITAGE SKILLS INITIATIVE and other schemes
Stanegate Restorations have agreed to offer a part-time placement to another trainee, on a similar scheme to the EHSI.
The first task was to assist with work on the Forcett Coach, including re-installing the brake box / cover.
The second project has been to assist with NSR127 - the first real challenge has been to build a set of eight droplights for NSR 127, and after maching timber, the work pr… (read more)
The first task was to assist with work on the Forcett Coach, including re-installing the brake box / cover.
The second project has been to assist with NSR127 - the first real challenge has been to build a set of eight droplights for NSR 127, and after maching timber, the work pr… (read more)
Jump to top
RSS feed- Latest items - Subscribe to the latest items added to this album
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter