This is the composite underframe from NER 2853 [built 1901] and two BR Mk1 bogies. The aim of the project is to unite them as a rolling chassis.
They arrived on 4th July 2024, and the initial inspection revealed some lagged pipework that requires specialist attention before we can do anything else. That work was completed without much problem ... and we are now discussing various options & a work …  (read more)