NSR 61 - Interior works
NSR 61 - Repaired side section
NSR 61 - section replaced
NSR 61 - side section to be repaired
NSR 61 - Roof Planks
LB - grooving jig
FU - TinMan Films at Saltburn
NSR 127 - grab handles
BBH - Display case at Coniston
CF - cake to share
CF - Cliff Lift team signed
CF - NSR 61 : Team signed
CSB - Lakes ID
FRG - Caversall Road
FRG - Crane Tank
FRG - grounded bodies
FRG - Locos on display
FRG - Northern Shed
MF - early progress (head)
MF - Galley sink tops
NSR 61 - Brassware
NSR 61 - dry built roof, in primer
NSR 61 - end beads, test fitted
NSR 61 - Hinge fitting
NSR 61 - Seat building
MF - View of engine (Nov 2013)
MF - Under berth locker (Nov 2013)
MF - Single Berth (Nov 2013)
MF - Looking Aft (Nov 2013)
MF - Engine Room (Nov 2013)
MF - Double Berth (Nov 2013)
NSR 61 - waist panel
NSR 61 - to be repaired
NSR 61 - starting undercoats
NSR 61 - split roofstick
NSR 61 - more doors primed
NSR 61 - metal strip
NSR 61 - gutters
NSR 61 - end panelling
NSR 61 - end frame
NSR 61 - droplights as kits
NSR 61 - defelting roof
NSR 61 - bulkhead sanded
NSR 61 - beading cleaned
NSR 61 - roof work
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
583 visits
NSR 61 - Progress shot (Nov 2013)


Refitted lower side and end panels (in undercoat) test hanging of one door (in primer) and seats being dry built. Various areas being prepared for painting after repairs.
, , and 2 other people have particularly liked this photo
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.