NSR 127 - grain filler
NSR 127 - floor plank evidence
NSR 127 - new door parts
NSR 127 - middle hinge
NSR 127 - primer on panel
NSR 127 - door part details
NSR 127 - repairs to uprights
NSR 127 - side module replaced
nbx - new bird boxes
O&S - old ghost sign
LB - joins in the work
TiG - Wickham (Deeside)
LB - 2013-14 Trainees
OOD - hydraulics in use
MF - old life ring
SWP - restored spotlight
OOD - joints close up
OOD - stile off
CSB - needs work (1)
CSB - needs work (2)
CSB - penta number
CSB - engine almost finished (1)
CSB - engine almost finished (2)
NSR 127 - cills installed
OOD - stile removed
OOD - machining stiles
CSB - refitting parts
OOD - doors in situ
OOD - damaged doors
OOD - door surface
CSB - progress of the engine rebuild
CSB - block pre-paint
BM FC - rebuilding underway
BM FC - touching up brackets
BM FC - varnishing
BM FC - doors progressing
BM FC - finishing in progress.
gbw - March 10th Lake District fells
SSW - attaching metalwork
BM FC - brake and box
CF - more garden
BBH - display case
SWP - turned spotlight stand fittings
BJ - cleaning up joint
1001 - AFS hose carrier
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
455 visits
NSR 127 - first corner module


That came out rather easily......hope the other three do the same. The carriage corner post is alongside "on the bench" - both for inspection / assessment before starting work.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.