BR DB - deconstruction
BR DB - PGB and HeadStock
BR DB - last off
BR DB - wheels left
BR DB - belt it
BR DB - yepp!
BR DB - Next move?
BR DB - hit it!
BR DB - trial assembly
BR DB - recycled sleeper
BR DB - wheels away
BR DB - painting starts
BR DB - axle box primer
BR DB - misc iron in primer
BR DB - hole in oak
BR DB - W-iron in gloss
BR DB - painting in progress
BR DB - wheel 1
BR DB - wheel 2
BR DB - oil seal
BR DB - wheels in
BR DB - more body building
BR DB - shelter dry fit
BR GW - Under the heapstead April 2011
BR GW - leaving 3
BR GW - cast in letters
BR GW - B49 at Springwell
BR GW - painting in progress
BR GW - wheels to go
BR GW - last metal bit
BR GW - PGB demolishing
BR GW - any old iron
BR GW - more deconstruction
BR GW - nut kebabs
BR GW - remains 2
BR GW - remains 1
BR GW - first part off
BR GW - drop side removed.
BR GW - drop sides 01
BR GW - B49 end03
BR GW - B49 end 02
BR GW - B49 end 01
BR GW - B-49 and No 25
BR GW - B-49 at Haltwhistle.
BM gen - Delivered
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
379 visits
BR DB - arriving at Haltwhistle


The Bowes Railway have asked us to rebuild a couple of waggons damaged by a recent arson attack.
This is B1, the Kibblesworth Drift Bogie about to be winched off Webster's Brimec.
Translate into English
This is B1, the Kibblesworth Drift Bogie about to be winched off Webster's Brimec.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.