NER70 - roof boards done
NER70 - Dry fit of new side.
NER70 - replaced timber
BM BV - Bread Van in storage
BM BV - Bread Van arrive 1
BM BV - Bread Van arrive 2
BM BV - hub cap name
BM BV - cill replaced
BM BV - tailgate before
BM BV - tailgate repairs 1
BM BV - interior before
BM BV - under planks 1
BM BV - no problems 2
BM BV - no problems 1
BM BV - no problems 3
BM BV - under planks 2
BM BV - no problems 4
BM BV - extent 1
BM BV - extent 2
BM BV - woodworm 1
BM BV - repairs in progress 1
BM BV - woodworm 2
BM BV - PGB new shaft
NER70 - roof plank
NER70 - conserved writing 1
NER70 - paintlayers
NER70 - sealer in place
NER70 - sealing fabric
NER70 - floor 2
NER70 - floor 1
NER70 - roof stick joint
NER70 - at Chester Le Street
NER70 - writing 4
NER70 - writing 3
NER70 - writing 2
NER70 - brass ring
NER70 - old bolts 1
NER70 - oilcloth
NER70 - bung etc
NER70 - hole in the roof
NER70 - writing 1
NER70 - inside the roof
NER70 - delivery 4
NER70 - delivery 3
NER70 - delivery 1
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
620 visits
NER70 - not a good plank


The one end of this plank was a little too wavy to be used, so it was just as well that we only needed the other end!
(fortunately, It was the only one in the batch with the problem)
Translate into English
(fortunately, It was the only one in the batch with the problem)
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.