Under the screens
Murmuration
One each way
Pierhead detail
Top of the hill
1893
Gas and coal
Morris
Sugar
British Coal meet Opencast Executive
Gas
Middlewood
Police
Foggy morning at Tianzhuang
NorthwesterN 100
Sackville Building
Leopard
Littleborough
Langley Buildings
Marple locks
Jitong freight
Doorway
Main line survivor
Coal stage
Puss in Boots
1-7 Constitution Hill
Hazel Grove
The new bridge
Stockpile
Biomass empties
Locked gates
Yeo
Steelworks steam
Washery
Mine service
Viscose
Shaft kilns at work
Pye Kiln
Platform 5
West Burton
End of the line
Industrial railway
Eyes on the road ahead
Prince
Garratt service
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
91 visits
Polythene plant


Petrochemicals have been produced on the Carrington site since 1949. The main output from this plant was polypropylene and polyethylene .
Formerly operated by Shell the Carrington site is part of the LyondellBasell Industries Group of Companies which was formed at the end of 2007 by the combination of Basell Polyolefins and Lyondell Chemicals. The majority of the chemical plant here has subsequently been demolished with the LyondellBasell presence vastly reduced.
Formerly operated by Shell the Carrington site is part of the LyondellBasell Industries Group of Companies which was formed at the end of 2007 by the combination of Basell Polyolefins and Lyondell Chemicals. The majority of the chemical plant here has subsequently been demolished with the LyondellBasell presence vastly reduced.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.