Hurdsfield Collieries
Canal Feeder
Longport
Longport Wharf
Vernon Poynton
Cobridge
Huncoat Accrington
Wansbeck Road
Approaching the summit
Three in one
Winnington from the river
Mine railway passenger service
Track gang
Beware
Lindong next stop
Welcome to Ballinamore
Peat Railway
Grand Canal sunset
Fiddlers Ferry
Glossop
Castle New Brickworks, Buckley
West from Chaganhada
Centura Foods, Middlewich
Storming uphill
Vitros
Two pints of Guinness
Collapsed
Hesketh Pit
Longton
North Western Days
Bank End Colliery Sough
Bibendum
Joined-up thinking
Danebower Colliery
Looking to Wales
Tunstead and the temple
Sunrise on Nanchang Bank
Nancha Bank
Evening at Kostolac shed
MCBC brick
Lostock Works
Gowhole sub-station
Thornsett Hey Sough
Newtown Viaduct
Reservoir technology
See also...
Keywords
Authorizations, license
-
Visible by: Everyone -
All rights reserved
-
230 visits
Time for a quick adjustment


Loaded trains are banked, by the locomotive from the previous train of empties, from Lixin to the summit of the Huanan Coal Railway. At the summit the brakes are screwed down on the wagons and the train locomotive checked over before the banker drops back to Lixin to pick up its train and continue the journey to the mine.
This wonderful scene can still be observed several times a day during the periods when the line is operating.
This wonderful scene can still be observed several times a day during the periods when the line is operating.
- Keyboard shortcuts:
Jump to top
RSS feed- Latest comments - Subscribe to the comment feeds of this photo
- ipernity © 2007-2025
- Help & Contact
|
Club news
|
About ipernity
|
History |
ipernity Club & Prices |
Guide of good conduct
Donate | Group guidelines | Privacy policy | Terms of use | Statutes | In memoria -
Facebook
Twitter
Sign-in to write a comment.